Demand

  • General Service Demand (Rate 7) — This rate is for larger loads that are above 50 kW and below 500 kW. This rate is a 3 part rate where the account is charged a facility charge, energy charge, and a demand charge.
  • General Service Large Demand (Rate 9) — This rate is for larger industrial loads that have a load of 500 kW or more.

For each meter connected, a security deposit of 2 times the average or projected 1-month bill at the billing location is required. The amount of security deposit may be adjusted after 3 months of usage if there is any substantial variance in the estimate from actual usage.