Like all other utilities, SVEC cannot guarantee continuous service. This is outlined in our Membership Agreement. Therefore, SVEC will not be liable for damages caused by events that are beyond our control, such as power outages caused by large storms.…
When unplanned tree trimming is necessary after a storm, SVEC crews do not remove the debris. Our crews will make the area safe, but then must move on to their next job. In these situations, call your community’s public works…
For safety reasons, repairs to the electric system can only be done by trained lineworkers. Tree trimming and removal crews will work ahead of our linemen, but they do not have the training, experience, or equipment to make repairs.
Just because you don’t see one of our trucks, that doesn’t mean we’re not working to restore your power. Outages are caused by a variety of reasons, and the cause may be in someone’s back yard a few blocks away,…
There’s not one specific answer that applies to every situation. However, a general explanation is that your neighbors may have power when you don’t because they are served through a different set of connections. Our engineers and linemen work hard…
If you reported your outage using a phone number, it’s possible that the number isn’t the one that’s associated with your account. Let’s make sure all the information associated with your account is correct. A great way to report an…
It is very difficult, especially in the early stages of storm restoration, to provide reliable estimates of restoration times for specific locations. The situation is often fluid because of the constantly changing conditions that occur during and after a storm.…

After breakfast very early this morning, crews fanned out again across Suwannee Valley Electric Cooperative's (SVEC’s) 2,100 square mile service territory to restore power to the 1,158 consumers still out as of 5 am. The crews from SVEC, contractors, and mutual-aid cooperatives restored power to 11,369 consumers yesterday and last night.

Crews have restored power to 5,421 consumers since early this morning, but Suwannee Valley Electric Cooperative (SVEC) continues to experience a large number of outages caused by Tropical Storm Elsa.
Receipts must be submitted within 60 days of the approval of your grant.